Expected development of capacity and rates during period 2016 – 2035

 

Year/Season 1.4.2016-31.3.2017
1.4.2017-31.3.2018
1.4.2018-31.3.2019
1.4.2019-31.3.2035
Working Gas Capacity (MWh)
2 260 000 2 373 000 2 430 000 2 430 000
Max. Injection Rate (MWh/h)
1 424 1 503 1 582 1 582
Max. Withdrawal Rate (MWh/h)
2 288 1 303 2 543 2 543

 

Updated: 03/2018